-
Motomotive, LLCThe precision of the products I ordered is very high, I did not expect that this company can control the tolerance to the range I need, and the service is very good and every problem can be solved. -
JADA INTERNATIONALHad an order made from steel, quality is great! Everything was to spec and the part fit perfectly for what was needed. Would use this company in the future! -
ConnecticutThey followed our technical drawings to perfection. No deviations in critical dimensions, and everything matched our CAD files precisely -
Morimotothese are amazing quality. I ordered from three companies from China this company had my order to me immediately very impressed with their diligence and shipping is 10 stars! I'll be making another order right now.
ISO9001 Certified White Acetal CNC Machined Parts with ±0.002~0.005mm Tolerance for Electronics Box
| Place of Origin | China |
|---|---|
| Brand Name | IMission |
| Certification | ISO9001 |
| Model Number | ODM and OEM |
| Minimum Order Quantity | I PC |
| Price | 0.1~5USD |
| Packaging Details | Bubble and Carton or Customization |
| Delivery Time | 7~35 working days |
| Payment Terms | L/C,D/A,D/P,T/T,Western Union,MoneyGram |
| Supply Ability | 10000pcs per month |
| Material | Acetal | Weight | 0.1-10kg |
|---|---|---|---|
| Key Word | CNC Machining Parts | Shipping Method | Express, Air, Sea, Etc. |
| Feature | Durable And High Precision | Processing | CNC, Turning, Milling, Auto Lathe, Grinding, Stamping,Available Surface Finishes To Ensure Part Corrosion Resistance, Aesthetics, And Specific Functionality, We Offer Comprehensive Post-processing Services: Plating: Zinc Plating, Nickel Plating, Chrome Pla |
| Surface Finishing | Polishing, Grinding, Anodize, Oxide, Laser, Engrave, Painting, Powder Coating, Hardness, Etc. | Material Available | Aluminum, Copper (Brass), Stainless Steel, Steel, Acetal, ABS, PVDF, PVC, Titanium,Etc. |
| Highlight | ISO9001 Certified CNC Milling Parts,100% Inspection CNC Machined Parts,3D Printing Precision Milled Components | ||
| Highlight | White Acetal CNC Machined Parts,±0.002~0.005mm Tolerance Precision CNC Components,ISO9001 Certified CNC Milled Parts |
||
| Product Name | CNC Machining Parts |
|---|---|
| Material Available | Acetal |
| Processing | CNC |
| Tolerance | ±0.002~0.005mm |
| Drawing Accepted | IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad, or Samples |
| Inspection | CMM, Projector, Height Gauge, etc. |
| Lead Time | 7~35 working days |
| Quality Assurance | ISO9001:2015, SGS, RoHs |
| Payment Term | MoneyGram, Western Union, T/T, D/P, D/A, L/C |
| Price | According to your drawing or requirements |
| Engineer Support | Available for engineering assistance and drawings design |
| Packaging | Bubble and Carton or Customization |
|---|---|
| Port | Shenzhen |
Quality Assurance & Inspection
A. Inspection Equipment
Multi-Sensor CMMs: 3D measurement with 0.001mm accuracy
Optical Comparators: Profile projection with 20× to 100× magnification
Surface Roughness Testers: Portable and benchtop Ra/Rz measurement
Hardness Testers: Rockwell, Brinell, Vickers, and micro-hardness
Thread Gauges: Complete sets to ISO/ANSI standards
Digital Calipers/Micrometers: 0.001mm resolution, calibrated regularly
Roundness Testers: Concentricity and cylindricity measurement
Force Measurement: Torque testing, spring constant verification
B. Quality Certifications & Processes
ISO 9001:2015 certified quality management system
First Article Inspection (FAIR): AS9102/PPAP documentation available
Statistical Process Control (SPC): Real-time monitoring of critical dimensions
Material Traceability: Mill test certificates, heat/lot number tracking
Calibration Program: All inspection equipment calibrated to NIST standards
Document Control: Revision-controlled drawings and specifications
- Manufacturability Review: Identification of potential production issues
- Cost Reduction Analysis: Alternative approaches, material optimization
- Tolerance Analysis: Statistical tolerance stacking, specification review
- Fixture/Tooling Design: Custom workholding solutions for complex parts
- Process Optimization: Sequencing, tool selection, cycle time reduction
- CAD Software: SolidWorks, CATIA, UG/NX, Autodesk Inventor, AutoCAD
- CAM Software: Mastercam, HyperMILL, PowerMILL, CATIA, UG/NX
- Simulation: Virtual machining verification, collision detection, material removal simulation
- Reverse Engineering: 3D scanning (laser, structured light) to CAD model conversion
- Prototyping: Rapid prototyping support via 3D printing for design validation
- Finite Element Analysis: Stress, thermal, modal analysis for component optimization
- Fluid Dynamics: Flow analysis for manifolds, fluid system components
- Thermal Analysis: Heat sink performance, thermal management solutions
- Drafting & Documentation: Creation of manufacturing drawings, GD&T application
- RFQ Submission: Provide drawings (PDF/DWG), 3D models (STEP/IGES/SLDPRT), specifications
- Technical Review: Engineering assessment, DFM analysis, process planning (24-48 hour response)
- Quotation: Detailed pricing with breakdown (material, setup, machining, finishing)
- Prototype Phase (if required): Sample production with full inspection report
- Production Approval: Process validation, inspection plan agreement
- Manufacturing: Scheduled production with milestone updates (weekly/daily)
- Final Inspection: Complete FAIR or dimensional report before shipping
- Delivery: Appropriate packaging, shipping with tracking, customs documentation
| Production Type | Standard Lead Time | Expedited Options | Factors Affecting Lead Time |
|---|---|---|---|
| Prototype (1-10 pcs) | 5-15 business days | 3-5 days (+30-50%) | Material availability, complexity, fixturing |
| Low Volume (10-100 pcs) | 10-25 business days | 5-10 days (+25-40%) | Tooling requirements, secondary operations |
| Medium Volume (100-1,000 pcs) | 3-5 weeks | 2-3 weeks (+20-35%) | Production scheduling, capacity |
| High Volume (1,000+ pcs) | 6-12 weeks | 4-8 weeks (+15-30%) | Material procurement, dedicated production runs |
| Large Parts (>1m dimension) | 4-10 weeks | 3-6 weeks (+25-50%) | Special handling, machine availability |
