Customized Size High Precision CNC Turning Milling Parts CNC Machined Components ISO9001 Certified

CNC Turning Milling Parts
December 04, 2025
Category Connection: CNC Turning Milling Parts
Brief: Watch the demo to catch practical tips and quick performance insights. This video showcases our ISO9001 certified CNC machining process, demonstrating how we produce high precision turning and milling parts with tight tolerances. You'll see our advanced machinery in action, quality inspection procedures, and examples of custom metal components we manufacture for international clients.
Related Product Features:
  • Customized size CNC turning and milling parts with high precision machining capabilities.
  • Tight tolerance range from +/-0.002mm to 0.005mm for exceptional accuracy.
  • ISO9001:2015 certified manufacturing with additional SGS and RoHS compliance.
  • Accepts various file formats including IGES, STEP, SolidWorks, PRT, and AutoCAD.
  • Comprehensive inspection using CMM, projector, and height gauge equipment.
  • Flexible lead times ranging from 7 to 35 working days based on project complexity.
  • Multiple payment options including T/T, L/C, Western Union, and MoneyGram.
  • Professional engineering support available for design assistance and technical guidance.
FAQs:
  • What tolerance levels can you achieve with your CNC machining services?
    We maintain high precision tolerances ranging from +/-0.002mm to 0.005mm, ensuring exceptional accuracy for all custom machined components.
  • What file formats do you accept for custom part manufacturing?
    We accept multiple file formats including IGES (igs), STEP (stp), SolidWorks (sodprt), PRT, AutoCAD files, and can also work from physical samples.
  • What quality certifications does your manufacturing facility hold?
    Our facility is ISO9001:2015 certified and also complies with SGS and RoHS standards, ensuring consistent quality and international regulatory compliance.
  • How long does it typically take to receive custom CNC machined parts?
    Lead times range from 7 to 35 working days depending on the complexity of your project, material requirements, and order quantity.