Customized CNC Machining Parts with Blackened Surface Treatment for Factory Price

Metal CNC Machining
November 21, 2025
Category Connection: Metal CNC Machining
Brief: Experience a brief tour of features designed to deliver dependable outcomes. This video showcases our ISO9001-certified CNC machining process, from rapid prototyping to 100% inspection, highlighting custom parts with blackened surface treatment for medical, automotive, and industrial applications.
Related Product Features:
  • ISO9001-certified CNC machining service for high-quality custom precision metal components.
  • Specialized broaching services for brass and copper parts using advanced CNC and stamping.
  • Wide range of surface treatments including polishing, anodizing, painting, and powder coating.
  • Tight tolerance control from ±0.002mm to ±0.005mm for precision manufacturing.
  • Accepts multiple file formats including IGES, STEP, SolidWorks, PRT, and AutoCAD.
  • Comprehensive inspection using CMM, projector, and height gauge for quality assurance.
  • Lead times from 7 to 35 working days with certifications including SGS and RoHS.
  • Flexible payment options including MoneyGram, Western Union, T/T, D/P, and D/A.
FAQs:
  • What industries are your CNC machining parts suitable for?
    Our CNC machining parts are designed for medical, automotive, and industrial applications, providing high-quality precision components for various sectors.
  • What surface treatment options do you offer for CNC parts?
    We offer a wide range of surface treatments including polishing, grinding, anodizing, oxide, laser engraving, painting, powder coating, and hardness treatment to meet diverse requirements.
  • How do you ensure the quality of your CNC machined parts?
    We perform 100% inspection using precision instruments like CMM, projector, and height gauge, and maintain ISO9001:2015, SGS, and RoHS certifications for quality assurance.
  • What is the typical lead time for custom CNC machining parts?
    Our lead times range from 7 to 35 working days depending on the complexity and quantity of the order, ensuring timely delivery for your projects.