Ürünler
Ürün ayrıntıları
Evde > Ürünler >
Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time

Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time

Adedi: IPC
Fiyat: 0.1~5USD
standard packaging: Kabarcık ve karton veya özelleştirme
Delivery period: 7 ~ 35 iş günü
Ödeme yöntemi: L/C,D/A,D/P,T/T,Western Union,MoneyGram
Supply Capacity: Ayda 10000 pcs
Ayrıntılı Bilgiler
Menşe yeri
Çin
Marka adı
IMission
Sertifika
ISO9001
Model numarası
CNC Freze
Malzeme:
Alüminyum
Ağırlık:
0.1-8kg
Hizmet:
OEM, ODM
Anahtar kelime:
CNC Freze Parçaları
Nakliye Yöntemi:
Express, hava, deniz, vb.
ürün süreci:
CNC Freze
Kalite:
% 100 muayene
Hizmetimiz:
24 saat çevrimiçi
Çizim:
ADIM,IGES,PDF...
Özellik:
Dayanıklı ve yüksek hassasiyet
Yüzey İşlemi:
Eloksal, Kaplama, Parlatma, vb
İşleme:
Cnc İşleme, Cnc frezeleme, Cnc dönüştürme
Vurgulamak:
ISO9001 Sertifikalı CNC Freze Parçaları,%100 Muayene CNC İşlenmiş Parçalar
Vurgulamak:

Aluminum CNC Milling Parts

,

Gold Anodizing CNC Milling Parts

,

100% Inspection CNC Machined Parts

Ürün Tanımı
ODM Aluminum CNC Milling Parts with Gold Anodizing Surface Treatment
High-precision CNC milled aluminum parts with durable gold anodized surface finish, available at competitive factory-direct pricing.
Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 0
Product Specifications
Place of Origin China
Brand Name OEM/ODM
Material Aluminum
Surface Finish Gold Oxidation
Size Support design
Color Gold
Thickness 0.5-20.0mm or Customized
Processing CNC Milling
Certificate ISO9001
MOQ 1 PC
Lead time 7-35 Working Days
Precision +/-0.002~0.005mm
Packaging and Delivery
Packaging Bubble and Carton or Customization
Port Shenzhen
Manufacturing Process Gallery
Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 1 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 2 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 3 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 4 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 5 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 6 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 7 Aluminum CNC Milling Parts with Gold Anodizing 100% Inspection and 7-35 Working Days Lead Time 8
Frequently Asked Questions
How is quality ensured? What certificate do you have?
We have obtained ISO9001 quality management system certification, and also we have a professional quality team and professional inspection and testing equipment to ensure quality.
What's your delivery time?
It depends on quantity, generally will takes 7-25 days after order confirmation.
Do you offer custom products?
If you have your own product drawing or a sample, please send us, and we can custom-made the hardware as your required. We have a professional technical team, if possible we also will provide our professional advices of the products.
How should I order and make payment?
For bulk production, 40% T/T in advance, balance before shipment.
What material of the product can you supply?
Steel, Stainless steel, aluminum, Brass, copper, nylon, steel, etc.
Which surface treatments do you support?
Polishing, Painting; Chroming, Andizing, Brushing; Texture, Sandblasting; UV coating.
Are you trading company or manufacturer?
We are manufacturer.
Site Haritası |  Gizlilik Politikası | Çin İyi Kalite Metal CNC İşleme Tedarikçi. Telif hakkı © 2025 iMission Industry Co.,Ltd - Tüm haklar saklıdır.