Produk
rincian produk
Rumah > Produk >
Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time

Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time

MOQ: I pc
Harga: 0.1~5USD
standard packaging: Gelembung dan karton atau kustomisasi
Delivery period: 7 ~ 35 hari kerja
metode pembayaran: L/C, D/A, D/P, T/T, Western Union, Moneygram
Supply Capacity: 10000 pcs per bulan
Informasi Rinci
Tempat asal
CINA
Nama merek
IMission
Sertifikasi
ISO9001:2015
Nomor model
Bagian pemesinan CNC
Bahan:
baja
Berat:
0,1-12 kg
Melayani:
Gambar Pelanggan OEM ODM
Kata kunci:
Bagian Penggilingan CNC
Metode Pengiriman:
Ekspres, udara, laut, dll.
Fitur:
Tahan lama dan presisi tinggi
Warna:
Disesuaikan, OEM
Toleransi:
+/- 0,001 ~ 0,005mm
Kemasan:
Palet, karton, paket standar
Menggambar:
LANGKAH, IGES, SolidWorks (sodprt), PRT, AutoCad, atau Sampel
Penyelesaian Permukaan:
Anodisasi, Pelapisan, Pemolesan, Anodisasi, Oksida, Laser, Pengukiran, Pengecatan, Asetal, POM...
Pengolahan:
Pemesinan CNC, Penggilingan CNC, Pembubutan CNC, Stamping, Pengelasan, Punching, Pengelasan Pemotong
Menyorot:
ISO9001 Suku Cadang Penggilingan CNC Bersertifikat , 100% Inspeksi Komponen Mesin CNC , Komponen Pen
Menyoroti:

Blackened Surface Treatment CNC Milling Parts

,

Steel CNC Milling Parts

,

7-35 Working Days Lead Time CNC Milling Parts

Deskripsi Produk
CNC Milling Parts with Blackened Surface Treatment
Specializing in exclusive broaching services for brass and copper parts, we deliver high-quality custom precision metal hardware through advanced CNC machining and stamping processes.
Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 0
Product Specifications
Product Name CNC Milling Parts
Material Steel
Processing CNC Milling
Surface Treatment Blackened
Tolerance +/-0.002~0.005mm
Drawing Accepted IGES(igs), STEP(stp), SolidWorks (sodprt), PRT, AutoCad
Inspection CMM, Projector, Height Gauge, etc.
Lead time 7~35 working days
Quality Assurance ISO9001:2015, SGS, RoHs
Payment Term MoneyGram, Western Union, T/T, D/P, D/A
Manufacturing Process
Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 1 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 2 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 3 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 4 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 5 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 6 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 7 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 8 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 9 Steel CNC Milling Parts with Blackened Surface Treatment and 7-35 Working Days Lead Time 10
Sitemap |  Kebijakan Privasi | Cina Kualitas Baik Mesin CNC Logam Pemasok. Hak cipta © 2025 iMission Industry Co.,Ltd Semua hak dilindungi.